You are here:
Calendar
  • Fallon Renewable Energy Workshop
    March 11, 2010 (12:00 pm - 4:00 pm)

    NV Energy, Wind Powering America and the USDA Rural Development are conducting an interactive workshop for NV Energy customers designed to educate ranchers, farmers, agriculture customers and rural area small businesses about incentives for installing...

  • New Energy Industry Task Force
    March 12, 2010 (9:00 am - 11:00 am)
    The first meeting of the New Energy Industry Task Force will be video conferenced between the State Capitol Annex Building in Carson City and the Governors Office in the Grant Sawyer Building in Las Vegas. The meeting is open to the public.
  • Carson Valley/Dayton Renewable Energy Workshop
    March 15, 2010 (12:00 pm - 4:00 pm)

    NV Energy, Wind Powering America and the USDA Rural Development are conducting an interactive workshop for NV Energy customers designed to educate ranchers, farmers, agriculture customers and rural area small businesses about incentives for installing...

  • Yerington Renewable Energy Workshop
    March 16, 2010 (12:00 pm - 4:00 pm)
    NV Energy, Wind Powering America and the USDA Rural Development are conducting an interactive workshop for NV Energy customers designed to educate ranchers, farmers, agriculture customers and rural area small businesses about incentives for installing...
  • Elko Renewable Energy Workshop
    March 17, 2010 (12:00 pm - 4:00 pm)
    NV Energy, Wind Powering America and the USDA Rural Development are conducting an interactive workshop for NV Energy customers designed to educate ranchers, farmers, agriculture customers and rural area small businesses about incentives for installing...
View Full Calendar
Carson Wind Ordinance Update PDF Print E-mail
The Carson City Planning Commission unanimously recommended approval of a small wind ordinance on May 27, 2009. The proposed small wind turbine ordinance will next be reviewed by the Carson City Board of Supervisors on June 18, 2009.

The Planning Commission heard public testimony and discussed the matter for more than two hours. Following is a summary of the changes recommended by the Planning Commission:

 

- Minimum lot size: Recommend a minimum lot size of one acre for "horizontal-axis" wind turbines (typical propeller-type turbines); no minimum lot size for vertical-axis turbines (which are generally much quieter). There was previously no minimum lot size for any type of turbine.

 

- Number per parcel: Recommend a maximum of one turbine (vertical-axis) per parcel for parcels less than one acre; one turbine per acre for lots greater than one acre. There was previously no limit on the number per parcel.

 

- Maximum height: Recommend 60 feet maximum. The previous maximum height was 90 feet.

 

- Noise: Recommend a maximum of 25 dB(A) from a wind turbine at property lines on less than one acre; a maximum of 50 dB(A) at property lines of all other parcels.

 

For more information contact:


Lee Plemel, AICP, Planning Director

Carson City Planning Division

2621 Northgate Lane, Suite 62

Carson City, NV 89706

PH: (775) 887-2180 x30075

FX:  (775) 887-2278 

 
< Prev   Next >